Empty Vande Bharat train travels 463 km with faulty brakes; probe ordered
According to railway officials, the braking arrangement of the passenger train had to be connected to the braking system of the freight locomotive assigned to pull it for the entire journey. However, railway personnel allegedly failed to ensure that the two systems were properly integrated. They also reportedly…
How the newspaper covers this story
Empty Vande Bharat train travels 463 km with faulty brakes; probe ordered
According to railway officials, the braking arrangement of the passenger train had to be connected to the braking system of the freight locomotive assigned to pull it for the entire journey. However, railway personnel allegedly failed to ensure that the two systems were properly integrated. They also reportedly…




